Traverse City Record-Eagle

Opinion

April 2, 2013

Editorial: Tunnel work had to be done

When you build a $3 million house you don’t skimp on the front porch, particularly when the concrete is cracked, the paint is peeling and the lights are on the blink. That pretty much describes Traverse City’s decision to spend $396,000 to perform long-overdue work on the pedestrian tunnel that runs under Grandview Parkway at Cass Street and links the city to Clinch Park.

The city is well along in a $3 million renovation of Clinch that is likely to draw a lot more people to the park overlooking Grand Traverse Bay. That makes updating the tunnel a must, not an option.

The tunnel is crucial to getting visitors across the Parkway in one piece. While there are traffic lights at Union and Park streets that make crossing better than dodging traffic, the tunnel is a direct link from the main city parking lots and much easier — and safer — for families with kids in tow to navigate.

In recent years, however, the tunnel has gotten pretty shabby and needs work. Some visitors steer away from the tunnel because it’s perceived as dark, dingy and a bit ominous; with its poor lighting, using it at night can be spooky.

The upgrades should help. They include an electric snow melt system to keep the tunnel open year-round — which will be powered, at least in part, by a $21,000 solar and wind energy arrangement — resurfacing concrete walls with limestone blocks, replacing a blue awning near the entrance with new signage, installing LED lights in the tunnel itself, widening tunnel entrances, landscaping, adding bike racks and new stairs near the parking lot at the south entrance.

Upgrading the lighting and widening the entrances will be key. Easy access means a lot to families with kids and a stroller or those who use a wheelchair to get around. Even during the day the middle of the tunnel can be dim enough to give parents pause. The tunnel has to be easy to get in an out of, bright and clean, and welcoming even at night.

City Commissioner Mike Gillman, who voted against the plan, said he wanted to see a cost-benefit analysis of the solar and wind energy system. That’s a prudent request. Taxpayers may support the concept of replacing coal-fired power with renewables, but they should know the cost.

The tunnel needed work even if Clinch wasn’t getting a makeover. But it is, and the tunnel has to be up to date.

 

 

1
Text Only

Opinion Poll
AP Video
Captain of Sunken SKorean Ferry Arrested Raw: Fire Destroys 3 N.J. Beachfront Homes Raw: Pope Presides Over Good Friday Mass Raw: Space X Launches to Space Station Superheroes Descend on Capitol Mall Man Charged in Kansas City Highway Shootings Obama Awards Navy Football Trophy Anti-semitic Leaflets Posted in Eastern Ukraine Raw: Magnitude-7.2 Earthquake Shakes Mexico City Ceremony at MIT Remembers One of Boston's Finest Raw: Students Hurt in Colo. School Bus Crash Raw: Church Tries for Record With Chalk Jesus Raw: Faithful Celebrate Good Friday Worldwide Deadly Avalanche Sweeps Slopes of Mount Everest Police Arrest Suspect in Highway Shootings Drought Concerns May Hurt Lake Tourism Vermont Goat Meat Gives Refugees Taste of Home Calif. Investigators Re-construct Fatal Bus Cras Mayor Rob Ford Launches Re-election Campaign Appellate Court Hears Okla. Gay Marriage Case